Cochran Royal Warrant

Newbie Works, Annan, Dumfries & Galloway DG12 5QU Scotland

SAVED: PAGE: ACTIVE AREA:

Upgrade of Billerud Beetham Energy Centre

Date Published:

When Billerud Beetham. a world leader in the manufacture of speciality paper to the Health Care and Packaging markets, were looking to upgrade their energy centre they chose to purchase 2 high efficiency Cochran Thermax boilers. The boiler and economiser systems were designed to be over 94% efficient and fitted with Cochran's Equinox burner complete with touch screen, microprocessor controls and variable speed drives.

Apart from the product quality Cochran was selected by Billerud because of the capability to manage the complete turnkey installation, to integrate the new plant with the existing facilities and then to deliver a complete after-market service.

Tony Halhead - Engineering Manager of Billerud - stated that "When selecting Cochran we looked at the whole package they could deliver. The support we received from Cochran was first class and the project was delivered on budget and on schedule. Billerud expect a payback of 2 years on their £1million investment representing 13% annual fuel saving as a result of the new installation"


Cochran boilers being lifted into position at Billerud Beetham site at Milnthorpe, Cumbria


< Article List

Share this article:

Total Pages:
Total Results:
Page Start:
Page Result #:

Contact Us

 

 

 

Check User:

This form collects and sends the information supplied to Cochran. You can read our privacy policy for full details on how we protect and manage your data.

  I consent to having Cochran collect the above details.