Challenge
Specification and installation of a larger, more efficient boiler in response to increased site activity that would
meet future emission regulations.
Solution
Installation of a new Cochran Thermax boiler, coupled with an Equinox gas burner, economiser, feed water tank and
blowdown vessel, controlled by Cochran's Synergy boiler house control and monitoring system.
Results
Increase in boiler efficiency to 95%, with installation of high efficiency ancillary equipment cutting boiler
electricity consumption by 35%.
Summery
The famous Glen Moray Distillery at Elgin in Scotland is undergoing significant expansion in response to buoyant
global sales of the famous Malt Whisky. This increased output meant that the distillers needed to increase
process steam output at the site through the installation of a larger, more efficient boiler that was future
proofed against stringent upcoming emission and H&S regulations.