Challenge
To deliver turnkey replacement of boiler plant within the confines of the existing boilerhouse footprint, in order to
meet increasing steam demand.
Solution
To provide three high efficiency Wee Chieftain boilers and associated equipment. Strip back and removal of existing
steam plant and pipework, redesign and install of new plant and pipework.
Results
Increased efficiency, output and a safety compliant plant that meets increased steam demand and current safety
legislation.
Summery
Thorntons is a world leader in confectionary production. As a result of increasing steam demand and Health and Safety
legislation, a proposal was submitted by the Thorntons Engineering team to senior management for Capital
investment to upgrade the existing boiler plant.