Thorntons Turnkey Replacement Boiler Plant

Project Type

Increased Steam, Efficiency and Safety

Client

Thorntons

Location

Thorntons Confectionary, Alfreton, Derbyshire

Challenge

To deliver turnkey replacement of boiler plant within the confines of the existing boilerhouse footprint, in order to meet increasing steam demand.

Solution

To provide three high efficiency Wee Chieftain boilers and associated equipment. Strip back and removal of existing steam plant and pipework, redesign and install of new plant and pipework.

Results

Increased efficiency, output and a safety compliant plant that meets increased steam demand and current safety legislation.

Summery

Thorntons is a world leader in confectionary production. As a result of increasing steam demand and Health and Safety legislation, a proposal was submitted by the Thorntons Engineering team to senior management for Capital investment to upgrade the existing boiler plant.

Click Here For Full Case Study

What could your business do with results like these?

Our sales team are available to discuss your project.

Give us a call on: 01461202111, or send us an email and we'll get back to you.

Contact Now

© Cochran • All Rights Reserved • Website presented on Big RedTerms & ConditionsLog in