Cochran install Solar Farm in drive for Net Zero
Category: General
Published: 12/04/2024
As part of the Cochran drive for Net Zero, installation work on our 495kWp solar farm is progressing well. 1,076 solar panels delivering 28% of the factory base load requirement.
Article Listing
About The Author
Internationally renowned boiler specialists, Cochran UK have been manufacturing, supplying and maintaining industrial boilers for over 135 years.